CIP DashboardEstimating

Estimate & Margin Review

Estimating Engine

Generate estimate line items from Digital Takeoff assemblies, edit production rates and unit costs, calculate labor, material, equipment, overhead, profit, contingency, tax, and final bid amount in real time.

TN Consulting & Solutions LLC

Enterprise demo workspace

Final bid amount

$17,022

3 takeoff-generated estimate lines

Direct cost

$12,051

$1,437 labor included

Gross margin

29.2%

18% profit target

Review flags

1

Pricing or production items need review

Estimate workspace dashboard

Northline Multifamily Renovation - Sprint 7 Estimate

Digital Takeoff quantities automatically populate estimate items. Assembly assignments generate labor, material, equipment, and cost-code lines.

Assembly / itemCost codeQtyLaborMaterialEquip.Total

Unit cost editor

ACT ceiling grid and tile

Quantity rollup

1,840 SF

From Digital Takeoff

Labor hours

45.2

Unit cost

$6

Needs supplier quote before final proposal.

Production rate editor

Production, labor, material, and equipment controls

Prep and paint hollow metal door/frame

1.25 EA/hr · factor 1.05

Interior wall paint from LF conversion

24 LF/hr · factor 1.12

Install resilient base

34 LF/hr · factor 1.05

Install ACT ceiling system

48 SF/hr · factor 1.18

Assembly pricing

Cost-code assignment

Paint hollow metal door and frame

09-91-23-DOR · EA · material $19

Interior wall paint from measured LF

09-91-23-WALL · LF · material $2

Resilient base install

09-65-13-BASE · LF · material $4

ACT ceiling grid and tile

09-51-13-ACT · SF · material $5

Flooring prep / finish area

09-65-00-FLR · SF · material $5

FRP wall protection

10-26-00-FRP · SF · material $6

Rated demising wall assembly

09-21-16-DW · LF · material $22

Estimate comparison

Bid scenario view

Initial rough order

$146,500 · margin 19.4%

Before calibrated takeoff rollups and assembly pricing.

Current assembly estimate

$17,022 · margin 29.2%

Generated from Sprint 5 takeoff quantities and assembly assignments.

VE option

$16,001 · margin 28.0%

Substitute ACT tile allowance and reduce premium access equipment.

Estimate history

Review trail

Created estimate from takeoff rollup

Anthony Acosta · $12,051

Assembly assignments generated estimate items automatically.

Updated ACT production factor

Estimator · $1,840

Difficulty factor set to 1.18 pending RCP review.

Applied standard markup profile

Executive review · $17,022

Overhead, contingency, profit, tax, and bond calculated.

Alternate pricing

Client options

Add premium after-hours access

$12,850

Adds shift premium and supervision allowance.

FRP wet-area upgrade

$9,400

Adds FRP protection in service rooms not currently shown on base scope.

Value engineering

Savings options

ACT tile substitution

Save $8,200

Use standard stocked tile instead of premium special-order tile.

Confirm spec compliance before proposal.

Paint system optimization

Save $6,100

Use one approved low-VOC system across unit and corridor walls.

Requires color and sheen approval.

Pricing databases

Labor, material, equipment, and cost code controls

Cost codes

7

Labor rates

6

Material prices

7

Equipment rates

3