CIP DashboardDocuments

Documents

Document Management

Upload, classify, track, search, and control bid invitations, drawings, specifications, addenda, proposals, estimate backup, and handover files with dashboard-connected missing-document warnings.

TN Consulting & Solutions LLC

Enterprise demo workspace

Controlled documents

7

4 active project files indexed

Package readiness

33%

2/6 required checklist items controlled

Document warnings

4

Warnings active on dashboard

Drawing revisions

2

1 addenda tied to bids/projects

Upload document UI

Classify new bid files before estimating

Capture category, project, bid relationship, revisions, due dates, status, reviewer, and scope notes before a file enters takeoff or handover.

No file uploaded in this session yet.

Project / bid relationship

Document category

Status

Revision or addendum number

Received date

Due date

Assigned reviewer

Scope notes

Document records are stored in local app data for the Sprint 4 demo.

Uploads are represented by classified records with file names, sizes, owners, due dates, and checklist links.

The model is ready to swap into database tables and object storage without redesigning the UI.

Missing document warnings

Dashboard-connected exceptions

Required missing, late, and needed documents are exposed here and on the executive dashboard.

Meridian Retail Shell Buildout

Latest addenda priced

Late

Addendum 02 still needs scope impact decision.

Addendum · Bid due Jul 15, 2026 · 1 days late

Meridian Retail Shell Buildout

Estimate backup attached

Needed

Backup depends on Addendum 02 pricing.

Estimate backup · Bid due Jul 15, 2026

Acton Townhome Turnover Package

Unit type matrix uploaded

Missing

Missing matrix blocks final quantity review.

Drawing · Bid due Jul 3, 2026 · 1 days late

Acton Townhome Turnover Package

Finish specification stored

Late

Finish spec is late.

Specification · Bid due Jul 3, 2026

Search and filter

Document control log

Search by document, project, client, note, or tag. Filter by category and status.

Northline Bid Invitation Email

Northline Multifamily Renovation · Regional Property Group

Invitation normalized into the bid intake worksheet.

Category

Bid invitation

184 KB

Received

Jun 24, 2026

Bid due Jul 8, 2026

Reviewed Details
Northline Renovation Drawing Set Rev A

Northline Multifamily Renovation · Regional Property Group

Sheet index loaded; unit matrix reconciliation remains open.

Category

Drawing

Rev A

Received

Jun 24, 2026

Bid due Jul 8, 2026

In review Details
Riverbend Proposal Draft

Riverbend Senior Living Repaint · Riverbend Senior Living Ownership

Needs executive review before client submission.

Category

Proposal

1.2 MB

Received

Jun 28, 2026

Bid due Jul 11, 2026

In review Details
Addendum 02 - FRP and Demising Wall Clarifications

Meridian Retail Shell Buildout · Meridian Builders Group

Received but not priced. Blocks final estimate review.

Category

Addendum

4.6 MB

Received

Jun 28, 2026

Bid due Jul 15, 2026

Estimate Backup - ACT and FRP Worksheet

Meridian Retail Shell Buildout · Meridian Builders Group

Backup cannot be completed until Addendum 02 pricing decisions are made.

Category

Estimate backup

0 KB

Received

Not received

Bid due Jul 15, 2026

Needed Details
Acton Unit Type Matrix

Acton Townhome Turnover Package · Regional Property Group

Missing matrix blocks reliable cabinet, tub, flooring, and paint quantity validation.

Category

Drawing

0 KB

Received

Not received

Bid due Jul 3, 2026

Missing Details
Acton Finish Specification

Acton Townhome Turnover Package · Regional Property Group

Finish spec is late and prevents proposal confidence.

Category

Specification

0 KB

Received

Not received

Bid due Jul 3, 2026

Document checklist

Required package controls

Latest addenda priced

Meridian Retail Shell Buildout · Anthony Acosta

Late

Addendum 02 still needs scope impact decision.

Estimate backup attached

Meridian Retail Shell Buildout · Anthony Acosta

Needed

Backup depends on Addendum 02 pricing.

Unit type matrix uploaded

Acton Townhome Turnover Package · Documents

Missing

Missing matrix blocks final quantity review.

Finish specification stored

Acton Townhome Turnover Package · Estimator

Late

Finish spec is late.

Revisions and addenda

Traceability from change document to bid package

Drawing revisions

Rev A · A0.00-A8.04

18 sheets · Jun 24, 2026

Current architectural set.

Rev B · G0.01-A7.16

31 sheets · Jun 28, 2026

RCP sheets changed and must be recounted.

Addenda impact

Addendum 02: FRP and demising wall clarifications

Meridian Builders Group · major

Pricing decision is open.

Document categories

Bid package taxonomy

Every file is classified so CIP can trace bid invitation to drawings, specifications, addenda, estimate backup, proposal, and handover package.

Bid invitation

1 controlled records

Drawing

2 controlled records

Specification

1 controlled records

Addendum

1 controlled records

Proposal

1 controlled records

Estimate backup

1 controlled records

Handover file

0 controlled records

09 91 23

Interior Painting

Base

09 21 16

Gypsum Board Assemblies

Addendum 02